Library

Volume 4 · Product Management & Agile Delivery for AI

Notebook
Sign in

Cheat Sheet — Part 2: Product Management & Agile Delivery for AI

557 words · about 3 min

Key Terms

Term In one line
Valley of Death The gap between a POC that impressed everyone and a production system nobody funded
RICE Reach × Impact × Confidence ÷ Effort — the prioritization score you’ll be asked to compute live
North Star metric The single number that proves the product works; differs per product type
Golden dataset Curated question/answer pairs that turn “it feels better” into a regression test
Definition of Done (AI) Deployed + tested + evaluated against the golden set above threshold
AI technical debt Six kinds: data, model, prompt, pipeline, evaluation, and config debt
Thin wrapper ~2 weeks of provider-abstraction code: routing, fallback, caching, rate limiting

Numbers That Matter

Figure Value Where it bites
Discovery 2 weeks, fixed The one phase you can quote precisely
POC 2–4 weeks Scales with data complexity, not feature count
MVP 6–12 weeks Scales with feature count
Debt capacity 20% of every sprint Non-negotiable, or the model silently rots
Feature tax +20% effort Tests, docs, monitoring on every new feature
Cost modelling Model 10× and 100× scale during POC The single most common POC omission
Failure triage 100 failed queries The sample size that makes failure modes visible
Innovation time 10–20% Experiments, POCs, learning

Decision Rules

  • Build when it’s your competitive advantage — routing logic, fallback chains, domain evaluation, the prompt layer. Buy when it’s undifferentiated — observability, vector DB hosting, annotation tooling.
  • Never train an LLM from scratch in an enterprise context. Fine-tune open-source embeddings if retrieval quality demands it; otherwise use a hosted model behind your own thin wrapper.
  • Use pgvector when you already run Postgres and are under ~1M vectors; move to a dedicated vector DB when filtering, scale, or hybrid search becomes the bottleneck.
  • Traditional agile breaks on AI in four places: requirements are probabilistic not deterministic, testing is threshold-based not binary pass/fail, sprint outcomes are learnings not just features, and technical debt includes data and prompts, not just code.
  • Fixing a quality complaint: Diagnose (1 week — classify 100 failures, interview users, compare against golden set) → Prioritize → Fix → Verify. Never skip straight to prompt-tweaking.
  • Squeezed from 12 weeks to 6? Find the real driver first (business event? competitor?), then propose a phased launch rather than a compressed one. Cutting the evaluation phase to hit a date is how you ship a system nobody trusts.

Say This Out Loud

“The Valley of Death is where most GenAI projects die — the demo works, everyone claps, and then nobody funds the production build because the POC never modelled cost at scale or defined what ‘good enough’ meant. So I insist on two things during the POC: a cost model at ten and a hundred times volume, and a golden dataset with an agreed accuracy threshold. Those two artifacts are what turn a demo into a funded programme.”

“My Definition of Done for an AI feature has an extra clause: deployed, tested, and scoring above threshold on the golden set. Without that last clause you can’t tell an improvement from a regression, and you end up shipping on vibes.”

“I ring-fence twenty percent of every sprint for debt, and I make the debt visible in business terms — ‘this causes two incidents a month and eight hours of manual reconciliation.’ Stakeholders never fund ‘refactoring.’ They reliably fund ‘two incidents a month.’”